Construction Map
View construction events up to 14 days from today.
Traffic Flow
Freeways 51 - 65mph 31 - 50mph 0 - 30mph No Data
Arterial Streets Light Medium Heavy No Data
Construction Projects
 NameDescriptionRouteCountyStart DateEnd DateStart MPEnd PMHot Spot
Data pager
Data pager
 Page 1 of 7, items 1 to 15 of 92.
US-6 Martin Road to Helper ~14291US-6 near HelperUS 6CarbonSummer 2019Summer 2019MP 236MP 239
I-15 Technology CorridorI-15 in Lehi (MP 284 - 279)I-15UtahWinter 2018Winter 2020MP 284MP 279
I-215 N Redwood RoadRedwood Road/I-215 InterchangeSR 68DavisWinter 2018Autumn 2019MP 63MP 64
I-15 SouthboundI-15 in Salt Lake County between S.R. 201 and 12300 S.I-15Salt LakeWinter 2018Winter 2019MP 305MP 291
I-70 BridgesRichfield to I-15I-70SevierSpring 2019Autumn 2019MP 7MP 21
Mountain View Corridor - 2100 North to S.R. 732100 North to S.R. 73Redwood RdUtahSpring 2018Autumn 2019MP 35MP 34
I-80/S.R. 36 Bridge ReplacementsI-80 WB at the SR-36 InterchangeI-80TooeleSpring 2018Autumn 2019MP 99MP 100
Redwood Road and Pioneer Crossing - Continuous Flow Intersection (CFI)Redwood Road and Pioneer Crossing intersection, Saratoga SpringsRedwood RdUtahSummer 2018Autumn 2019MP 31MP 32
Redwood Rd. (SR-68); Lake View Terrace Rd. to Village Pkwy.Redwood Rd. from Lake View Terrace Rd. to Village Pkwy. in Saratoga SpringsRedwood RdUtahSummer 2018Autumn 2019MP 27MP 29
I-80; Surplus Canal Bridge Repair (MP 117)Eastbound & westbound I-80 at Suplus Canal (MP 117; near SL International ....I-80Salt LakeWinter 2019Summer 2019MP 116MP 117
I-15 Exit 16 Interchange ImprovementsI-15 Exit 16 (SR-9)I-15WashingtonWinter 2019Autumn 2019MP 13MP 16
US-191 Monticello to Dry ValleyUS-191 Monticello to Dry ValleyUS 191San JuanSpring 2019Autumn 2019MP 72MP 89
I-15 Pedestrian UnderpassI-15 St. George at 400 SouthI-15WashingtonSpring 2019Summer 2019MP 8MP 8
SR-10 3200 South to 1150 South, PriceSR-10 South of PriceSR 10CarbonSpring 2019Winter 2020MP 65MP 67
US-6 Chip Seal Coat - 3 LocationsUS-6 HelperUS 6CarbonSummer 2019Autumn 2019MP 231MP 232
Lane Closures
RouteCountyDescriptionLanes AffectedDirectionStart DateEnd DateTypeStart MPEnd MP
Data pager
Data pager
12
 Page 1 of 2, items 1 to 15 of 29.
I-15DavisMotorists can expect nightly lane closures/lane shifts in both directions ....2Both Directions5/1/2019 12:00 AM10/31/2019 12:00 AMActiveMP 330MP 340
I-15Salt LakeDrivers should plan for lane closures on I-15 Southbound from S.R. 201 to ....3Southbound2/26/2018 12:00 AM12/31/2019 12:00 AMActiveMP 300MP 293
I-215 WSalt LakeMotorists can expect up to 4 lanes to be closed nightly as crews work to r....4Southbound8/5/2019 12:00 AM9/30/2019 11:00 PMActiveMP 18MP 18
I-70SevierTraffic will be reduced to one lane in both directions and will be shifted....1Both Directions4/15/2019 12:00 AM9/1/2019 12:00 AMActiveMP 9MP 12
I-70SevierThis project will rehabilitate the pavement by leveling the pavement in se....1Both Directions8/5/2019 12:00 AM10/31/2019 12:00 AMActiveMP 73MP 80
I-80Salt LakeCrews are installing a noise wall along Interstate 80 (I-80) adjacent to t....1Eastbound5/28/2019 12:00 AM9/9/2019 12:00 AMActiveMP 118MP 119
I-80Salt LakeWESTBOUND I-80 Nightly from 6:30 p.m. to 6:00 a.m. Work to westbound I-80....3Multiple Directions6/15/2019 6:00 PM8/30/2019 6:00 AMActiveMP 125MP 123
I-80TooeleCrews will begin preliminary bridge construction activities on I-80 over t....1Both Directions5/20/2019 12:00 AM9/27/2019 11:00 PMActiveMP 102MP 102
I-80TooeleCrews will be working under the bridge going over I-80 east of Wendover at....1Westbound8/18/2019 12:00 AM9/12/2019 12:00 AMActiveMP 4MP 4
I-80TooeleCrews will be working on the pedestrian bridge on I-80 at milepost 2.9. Th....1Westbound8/18/2019 12:00 AM9/12/2019 12:00 AMActiveMP 2MP 3
I-80TooeleCrews are working on the structure on I-80 between mileposts 1 and 2. This....2Both Directions8/22/2019 12:00 AM9/17/2019 12:00 AMActiveMP 1MP 2
I-84WeberWork continues on a pavement preservation project on Interstate 84 from Ri....1Both Directions4/1/2019 12:00 AM8/30/2019 12:00 AMActiveMP 82MP 88
SR 102Box ElderCrews will begin working to repave SR-102. Starting Monday June 10th, crew....1Both Directions6/10/2019 12:00 AM9/13/2019 11:00 PMActiveMP 15MP 18
SR 106DavisUDOT will rehabilitate the pavement on the SR-106 (Main Street) corridor f....2Both Directions5/6/2019 12:00 AM9/13/2019 11:00 PMActiveMP 1MP 5
SR 126WeberBeginning July 25 crews will begin removing and replacing pedestrian ramps....ALLBoth Directions7/25/2019 12:00 AM8/30/2019 11:00 PMActiveMP 11MP 15